The Most Important Tests For Medium Voltage Metal-Enclosed Switchgear (You SHOULD Perform)
The design of the insulation system for metal-enclosed switchgear is based upon life expectancy of about 30 years. However, environmental conditions such as dirt, moisture, and corrosive atmosphere can shorten… Read more
Mar 28, 2018 | By Edvard Csanyi
Good Practice Rules For In-Process Inspection Of Low Voltage Switchboard
The purpose of in-process inspection is to ensure product conformity after each manufacturing operation. This process concerns all the manufacturing operations done by the workshop operators. Inspection during the manufacturing… Read more
Mar 21, 2018 | By Edvard Csanyi
What does a good grounding of the power substation and switching station really mean?
Provision of adequate grounding in a substation and switching stations are very important for the safety of operating personnel as well a electrical devices do not rise above tolerable thresholds… Read more
Dec 18, 2017 | By Edvard Csanyi
Primary injection testing of protection system for wiring errors between VTs / CTs and relays
This type of test involves the entire circuit – current transformer primary and secondary windings, relay coils, trip and alarm circuits, and all intervening wiring are checked. There is no… Read more
Dec 13, 2017 | By Edvard Csanyi
Secondary injection tests for checking the correct operation of the protection scheme
Secondary injection tests are always done prior to primary injection tests. The purpose of secondary injection testing is to prove the correct operation of the protection scheme that is downstream… Read more
Nov 22, 2017 | By Edvard Csanyi
Commissioning Numerical Protection and Procedure For Carrying Out Performance Tests
Numerical protection is based on a number of microprocessors that can be programmed to reproduce virtually any type of protection and relay. It represents important advantages in reliability, space and… Read more
Oct 30, 2017 | By Edvard Csanyi
3 greatest enemies to the transformer operation (and how to prevent them)
The principal object of transformer maintenance is to maintain the insulation in good condition. Moisture, dust and excessive heat are the main reasons of insulation deterioration and avoidance of these… Read more
Jul 28, 2017 | By Edvard Csanyi
How do faults develop in a HV transformer and why condition monitoring is important
Condition monitoring equipment that can be used to extend the life of a transformer or to prevent catastrophic failure could pay for itself many times over. However, condition monitoring does… Read more
Jul 10, 2017 | By Edvard Csanyi
Pre-commissioning tests and in-service checks of protection system
The pre-commissioning tests need to be carefully programmed so that they take place in a logical and efficient order, in order that no equipment is disturbed again during subsequent tests…. Read more
Jun 14, 2017 | By Edvard Csanyi
Commissioning substation busbars in an efficient and modern way
The commissioning procedure of substation busbars for differential protection and other busbar protection schemes involves a large number of input and output circuits that require a verification check in both… Read more
Jun 13, 2017 | By Edvard Csanyi
Generation of high voltages in the lab (AC/DC, switching and lightning impulse)
Benjamin Franklin – The man who dared to fly his kite in a thunder storm! In this technical article laboratory tests and test equipment needed to assess the performance of… Read more
May 29, 2017 | By Edvard Csanyi
PLC power supply and safety (emergency) circuits requirements
The source for a PLC power supply is generally single-phase and 120 or 240 VAC. If the controller is installed in an enclosure, the two power leads (L1 hot and… Read more
Mar 15, 2017 | By Edvard Csanyi
Performing power factor test on dry-type transformer during commissioning
The power factor test is a maintenance test used to determine the insulation system dielectric power loss by measuring the power angle between an applied AC voltage and the resultant… Read more
Mar 01, 2017 | By Edvard Csanyi
Measurement of N–PE loop resistance in TN, TT and IT systems
Up-to-date test instruments, with built in modern electronics, can measure loop resistance even between the neutral N and protection PE conductors in spite of possible high currents in the neutral… Read more
Feb 24, 2017 | By Edvard Csanyi
Guidelines for high potential (Hi-Pot) DC testing of medium voltage cables
This technical article provides general guidelines for high potential “Hi-Pot” DC testing of MV power cables. All tests made following cable installation and during the warranty period must be performed… Read more
Feb 20, 2017 | By Edvard Csanyi