Erection Procedures For Medium Voltage Switchgear
Before commencing erection of medium voltage (MV) switchgear check that all connections are tight on busbars and on main and auxiliary circuits. Examine the insulation carefully, because there have been cases of burned out connections due to failure to observe… Read more
Apr 03, 2012 | By Edvard Csanyi
Energy and Power
Single-Phase Power vs Three-Phase Power
The principal elements of an electric power system are the generating stations, the transmission lines, the substations, and the distribution networks. The generators produce the electricity, the transmission lines move it to regions where it is consumed, and the substations… Read more