Search

Premium Membership

Get access to premium HV/MV/LV technical articles, technical guides & papers. Apply a 20% discount code: 99AF8 for a 1-year plan!

Monthly Archive for: «March, 2019»

Practical steps in the design of a substation grounding

Grounding at power substations is extremely important. Grounding system provides the ground connection for the grounded neutral for transformers, reactors, and capacitors and also the discharge path for lightning rods,…...

PREMIUM Membership Required

This content is available for Premium members only. Get access to premium HV/MV/LV technical articles, electrical engineering guides and research studies.
Apply a 20% discount code 99AF8 for a 1-year plan! Login ♛Sign Up ♛

Mar 29, 2019 | Edvard

Practical steps in the design of a substation grounding

Practical approach in design and installation of detuned capacitor banks

During last two or three decades, the number of nonlinear electrical loads inside all types of buildings and facilities (residential, business, commercial and industrial) has been significantly increased. All that…...

PREMIUM Membership Required

This content is available for Premium members only. Get access to premium HV/MV/LV technical articles, electrical engineering guides and research studies.
Apply a 20% discount code 99AF8 for a 1-year plan! Login ♛Sign Up ♛

Mar 15, 2019 | Miodrag Kokotovic

Practical approach in design and installation of detuned capacitor banks

Pilot schemes for transmission line protection

Pilot schemes simultaneously measure and monitor system parameters at all terminals of a transmission line, local and remote, and then respond according to their predetermined functions. These schemes require the… Read more

Mar 13, 2019 | Edvard

Pilot schemes for transmission line protection


Subscribe to Weekly Digest

Get email alert whenever we publish new electrical guides and articles.

Experience In LV/MV/HV projects

Join our Premium Membership and get access to advanced articles and papers.