Troubleshooting of a telemetry system (from RTU to the SCADA computer facilities)
This technical article reviews certain methodologies that may be followed for effective troubleshooting of a telemetry system from the digital or analog field input/output at the RTU to the computer facilities at the central site. Basic troubleshooting of the various… Read more
May 19, 2017 | By Edvard Csanyi
How to calculate number of steps & reactive power of the capacitor banks
Depending on the size of a compensation unit, it is assembled with capacitors of equal size (in bigger units) or of different size. A unit with a total reactive power of, for example, 300 kvar consists of six power capacitors,… Read more
May 17, 2017 | By Edvard Csanyi
Auto-reclose schemes for re-energising the line after a fault trip
Faults on overhead lines fall into one of three categories: transient, semi-permanent and permanent. 80-90% of faults on any overhead line network are transient in nature. The remaining 10%-20% of faults are either semi-permanent or permanent. Transient faults are commonly… Read more
May 15, 2017 | By Edvard Csanyi
Current sensors as the eyes of RCD and tips for their correct installation
All residual current devices are made up of at least two components. First component act as the eyes of RCD – sensors – must be able to supply an electrical signal which is useful when the sum of the currents flowing… Read more
May 12, 2017 | By Edvard Csanyi
How to recognize harmonics symptoms – What to look for and where to look?
Finding harmonics problem is relatively easy once you know what to look for and where to look. Harmonics symptoms are usually anything but subtle. This technical article provides some basic pointers on how to recognize problems with harmonics in power… Read more
May 10, 2017 | By Edvard Csanyi
Sizing calculations for 20/3.3 kV, 12.5 MVA transformer feeder cable
Typical calculations for a 20kV transformer feeder cable are presented below. After correct cable voltage classification the following considerations apply: Current carrying capacity Short circuit rating Voltage drop Earth loop impedance Consider a 20/3.3 kV, 12.5 MVA transformer to be… Read more
May 08, 2017 | By Edvard Csanyi
Dangerous magnetic field exposure near transformer substation in the building
Transformer substations located close to the living areas could induce high long-term exposures to extremely low frequency magnetic fields of nearby inhabitants. Some of the researches have shown increased risk to childhood leukemia associated with the long term exposure to… Read more
May 05, 2017 | By Edvard Csanyi
The attached rod technique – better than fall-of-potential ground testing method
Fall-of-potential testing is extremely reliable, highly accurate, conforms to IEEE 81 and gives the operator complete control over the set-up. Unfortunately, it is exceedingly time consuming and labor intensive, and requires that the individual ground electrodes be disconnected from the… Read more
May 03, 2017 | By Edvard Csanyi
Protection of capacitor banks by fuses during energization and operation
Stress specific to the protection of capacitor banks by fuses, which is addressed in IEC 60549, can be divided into two types: Stress during bank energization (the inrush current, which is very high, can cause the fuses to age or blow) and Stress… Read more
May 01, 2017 | By Edvard Csanyi
Why and where do internal faults happen in substation transformers
Transformers are subjected to many external electrical stresses from both upstream and downstream that can lead directly to internal fault(s). The consequences of any failure can be very great in terms of damage as well as in terms of operating… Read more
Apr 28, 2017 | By Edvard Csanyi
Typical power supply schemes for standby and production generator sets
The main types of prime movers used in engine driven generator sets for industrial sites and commercial buildings are Diesel engines, gas turbines, and steam turbines. Turbines are used mainly for production sets whereas Diesel engines can be used for… Read more
Apr 26, 2017 | By Edvard Csanyi
The most frequent errors in specifying current transformers (CTs)
Current transformers (CTs) form an essential link within the protection chain of electrical networks. Their specification, even if it is handled by specialists, often includes errors and is insufficiently optimized. This often leads to technological impossibilities, operating delays, extra costs,… Read more
Apr 24, 2017 | By Edvard Csanyi
Network harmonics analysis – Installation with 6-pulse rectifier, capacitors & filters
The diagram in figure 1 represents a simplified network comprising a 2,000 kVA six-pulse rectifier, injecting a harmonic current spectrum, and the following equipment which will be considered consecutively in three different calculations. So, let’s list these calculations and start with… Read more
Apr 21, 2017 | By Edvard Csanyi
Rules for dimensioning, disconnecting and protecting the neutral conductor
Dimensioning of neutral conductor Smaller than the cross-sectional area of the phase conductors… Equal to the cross-sectional area of the phase conductors Greater than or equal… Neutral conductor disconnection TN-C system TT or TN-S system IT system Important recommendations #1… Read more
Apr 19, 2017 | By Edvard Csanyi
Thumb rules for surge arrester installation in different earthing systems
A variety of documents deal with the subject of surge arrester installation: for example in France, standard NF C 15-531 focuses on the installation rules of LV surge arresters, and standard NF C 15-100 covers all the LV electrical installations…. Read more