Edvard Csanyi
1750 awesome technical articles
Hi, I'm an electrical engineer, programmer and founder of EEP - Electrical Engineering Portal. I worked twelve years at Schneider Electric in the position of technical support for low- and medium-voltage projects and the design of busbar trunking systems.
I'm highly specialized in the design of LV/MV switchgear and low-voltage, high-power busbar trunking (<6300A) in substations, commercial buildings and industry facilities. I'm also a professional in AutoCAD programming.
Biography: https://electrical-engineering-portal.com/edvard-csanyi
8 steps to follow in power substation design and engineering
Building a new substation or retrofitting the old one is a complex process full of design and engineering tasks to be worked on. The main steps in substation design and engineering are as follows: Selection of a substation switching system:… Read more
Sep 21, 2016 | By Edvard Csanyi
Three-phase transformer connections and vector groups for beginners
In theory a three-phase transformer works like three separate single-phase transformers with shared limbs in which the magnetic circuit for the outer limbs is longer than for the centre limb. The voltage transformation is determined by the ratio between the… Read more
Sep 19, 2016 | By Edvard Csanyi
How to locate harmonic currents and where to control them?
On radial utility distribution feeders and industrial plant power systems, the main tendency is for the harmonic currents to flow from the harmonic-producing load to the power system source. This is illustrated in Figure 1. The impedance of the power… Read more
Sep 16, 2016 | By Edvard Csanyi
What is grounding and why do we ground the system and equipment?
The term grounding is commonly used in the electrical industry to mean both “equipment grounding” and “system grounding”. Equipment grounding means the connection of earth ground to non-current carrying conductive materials such as conduit, cable trays, junction boxes, enclosures, and motor… Read more
Sep 14, 2016 | By Edvard Csanyi
Power flow in MV radial network and calculation of voltage drop and loss
In three phase system the load for each phase should be the same. We call symmetrical load when the load of each phase is equal. In symmetrical circuit each phase has same configuration, so in drawing we can represent only… Read more
Sep 12, 2016 | By Edvard Csanyi
What a ground fault circuit interrupter does and what it does not do
A ground fault circuit interrupter (GFCI) monitors the current balance between the ungrounded “hot” conductor and the grounded conductor. As soon as the current flowing through the “hot” conductor is in the range of 4 to 6 milli-amperes more than the… Read more
Sep 09, 2016 | By Edvard Csanyi
When does exciting current inrush occur in power transformer?
When a transformer is initially energized, there is a phenomenon known as exciting current inrush. Although inrush currents are not generally as damaging as fault currents, the duration of exciting current inrush is on the order of seconds (as compared… Read more
Sep 07, 2016 | By Edvard Csanyi
4 essential implementations of protective relays in power systems
In this technical article, protective relays are categorized depending on the component which are protect: Generators Transmission lines Transformers, and Loads There are different protection schemes used for protecting generators depending on type of fault to which they are subjected…. Read more
Sep 05, 2016 | By Edvard Csanyi
Answer 20 questions correctly and prove you are good electrician
It’s not easy to be a good electrician, that’s for sure. Things you studied hard (or still studying) are gradually being forgotten, especially electrical formulas. Well, these 20 questions tend to wake up your memory and test your electrical knowledge… Read more
Sep 02, 2016 | By Edvard Csanyi
Direct and indirect measurements using CTs and VTs
In order to measure electrical quantities, the measuring instruments must be connected to the lines safely, with maximum simplicity and convenience. Generally, the fundamental parameters to be detected are voltage and current, which respectively require a parallel connection and a… Read more
Aug 31, 2016 | By Edvard Csanyi
Breaking of a short circuit current in a direct current system
Direct current presents different problems than alternating current with aregard to the phenomena associated to the breaking of a short circuit current and interruption of other types of high value current since the arc extinction results to be particularly difficult…. Read more
Aug 29, 2016 | By Edvard Csanyi
What details a motor nameplate shows and how to use them
We have all seen the motor nameplate attached on the motor side (or on top). All motors have a permanent nameplate which lists all important data, further data is usually available in the motor catalogue. It is important to recognize… Read more
Aug 26, 2016 | By Edvard Csanyi
Calculate reactive power of the capacitor bank and improve power factor
For the dimensioning of the capacitor bank to be installed in order to improve the power factor of a plant, it is necessary to calculate correctly the power factor according to the consumption or to the load cycle of the… Read more
Aug 24, 2016 | By Edvard Csanyi
Should you choose fixed or withdrawable medium voltage switchgear?
How to make the right choice between fixed or withdrawable medium voltage switchgear when selecting a new equipment for power substation? The following evaluation procedure should be conducted: Find out how important the additional aspects are. Weigh up the financial… Read more
Aug 22, 2016 | By Edvard Csanyi
Motor wiring guidelines (Cable shielding, grounding and splicing techniques)
This technical article describes shielding, grounding, and splicing techniques for use with motor wiring. This article covers the following topics: Understanding noise in motor power wiring Shielding motor power cables Grounding motor power cable shields Applying ferrite sleeves Splicing motor… Read more
Aug 19, 2016 | By Edvard Csanyi
