Zafar Iqbal
3 awesome technical articles

Electrical engineer with more then 5 year experience in Electrical Transmission and Distribution Field. Highly specialized for design, installation and testing of HV/MV T&D lines and Power Substations.
Test On 110kV Power Cable After Installation (3)
In previous two parts of this technical article first six procedures were explained. Now the last three (7, 8 and 9) will be explained in details: Phase indication test (part 1) DC conductor resistance measurement (part 1) Capacitance test (par 1)… Read more
Jan 02, 2015 | By Zafar Iqbal

Test On 110kV Power Cable After Installation (2)
In previous part of this technical article first three procedures were explained. Now the rest will be explained in details: Phase indication test (previous part) DC conductor resistance measurement (previous part) Capacitance test (previous part) DC Sheath test on outher sheath… Read more
Dec 26, 2014 | By Zafar Iqbal

Test On 110kV Power Cable After Installation (1)
Site test procedure covers all necessary electrical testing for the 110 kV cable and accessories to be carried out during and after installation of the cable system. This procedure is in line with the requirements of the contract suitable for… Read more
Dec 22, 2014 | By Zafar Iqbal
