Cable engineering in substations and power plants
Is it true that single core cable should be unarmored because eddy currents are induced in armor of single core cable which will cause additional losses? If true then why not three core cables also unarmored and why single core… Read more
Oct 22, 2012 | By Asif Eqbal
Testing and Commissioning of Current Transformer
This technical article is prepared to help the commissioning personnel effectively perform and carry out the testing and commissioning tasks on current transformers before taking the equipment to service condition. General testing procedures for the current transformers (CTs) described in… Read more
Oct 19, 2012 | By Edvard Csanyi
Switching Impulse Test of the Transformer
The switching impulse test is applied to confirm the withstand of the transformer’s insulation against excessive voltages occurring during switching. During the switching impulse voltage test, the insulation between windings and between winding and earth and withstand between different terminals… Read more
Oct 11, 2012 | By Edvard Csanyi
Fire-Fighting Precautions in Power Substation
The layout of the plant and the design of the building play a major part in reducing the spread of fire and the effect of explosions. For example, equipment and buildings should be arranged to have vents which rupture rather… Read more
Oct 09, 2012 | By Edvard Csanyi
Designing of HV Power Substation and Layout
Introduction Earthing and Bonding Substation Earthing Calculation Methodology (Earthing Materials) Layout of Substation Different Layouts for Substations (single busbar, mesh, 1 1/2 cb) Principle of Substation Layouts (spatial separation, maintenance zones) Components of a Substation (cbs, cts, isolators, insulation, transformers etc.) Substations are the… Read more
Oct 01, 2012 | By sprabakar22
Transformers Connected Directly to Generators
Power transformers connected directly to generators can experience excitation and short-circuit conditions beyond the requirements defined by ANSI/IEEE standards. Special design considerations may be necessary to ensure that a power transformer is capable of withstanding the abnormal thermal and mechanical aspects that… Read more
Sep 01, 2012 | By Edvard Csanyi
Site Conditions Impact on Caterpillar Genset Ratings
An engine rating is primarily limited by structural and thermal limits. These limits include maximum cylinder pressure during combustion, turbocharger speed, exhaust gas temperature and in natural gas engines, fuel type. Where an engine operates relative to these limits will determine the maximum altitude and ambient… Read more
Aug 17, 2012 | By Edvard Csanyi
Principles of Transformers in Parallel Connection
For supplying a load in excess of the rating of an existing transformer, two or more transformers may be connected in parallel with the existing transformer. The transformers are connected in parallel when load on one of the transformers is… Read more
Aug 06, 2012 | By Jignesh Parmar
Bus Design In Aboveground Substations
Substations can be constructed partly or entirely within aboveground or belowground enclosures. However, cost is high and complexity is increased by fire-protection and heat-removal needs. The following discussion deals with exposed aboveground substations. The bus and associated substation equipment are… Read more
Jul 21, 2012 | By Edvard Csanyi
Field Inspection of New Medium-Voltage Switchgear
Step Description of what you should do 1.1 Check switchgear assembly for alignment, levelness, and tightness of all bolting. 1.2 Check all equipment for the removal of blocking, supports, temporary ties, and temporary jumper wires. 1.3 Check control power transformer… Read more
Jul 16, 2012 | By Edvard Csanyi
Delta-Star Transformer Connection Overview
The Delta-Star transformer connection is utilized to increase voltage levels and is frequently applied at the end or beginning of high-tension power transmission systems. The primary is configured in a delta arrangement, while the secondary is arranged in a star… Read more
Jul 10, 2012 | By Jignesh Parmar
Typical noise levels in power substation
Equipment noise levels may be obtained from manufacturers, equipment tendering documents, or test results. The noise level of a substation power transformer is a function of the MVA and BIL rating of the high voltage winding. These transformers typically generate… Read more
Jul 05, 2012 | By Edvard Csanyi
Assemblies of switchgear and control panels (3)
Continued from 2nd part of article: Assemblies of switchgear and control panels (part 2) Now coverage of distribution panels and switchboards will be presented including molded case circuit breakers (MCCB), safety switches, panelboards, multimetering equipment, ground fault circuit interrupters. Most of the… Read more
Jun 30, 2012 | By Edvard Csanyi
Assemblies of switchgear and control panels (2)
Continued from 1st part of article: Assemblies of switchgear and control panels (part 1) Other components that are needed for the proper operation of the switchgear or control panel but not necessarily part of the installation or maybe installed remotely are: The batteries… Read more
Jun 29, 2012 | By Edvard Csanyi
Assemblies of switchgear and control panels
Switchgear and control panels are found in power generating stations, transformer stations, distribution substations, commercial and institutional buildings, industrial plants and factories, refineries, paper mills, metal smelters and any other place where electric energy is utilized or electric power is… Read more
Jun 28, 2012 | By Edvard Csanyi