Identifying The Primary And Secondary Phasor Polarities Of Transformer – Polarity Test
This is needed for identifying the primary and secondary phasor polarities. It is a must for poly phase connections. Both a.c. and d.c methods can be used for detecting the… Read more
Aug 26, 2013 | By Edvard Csanyi
Commissioning of HV Panel – Operational and Functional Checkup
The main objective of the test is to check the proper operation function of the circuit breaker; in this test we do the following: This test is conducted by manual,… Read more
Jul 17, 2013 | By Edvard Csanyi
High voltage testing – Direct current (DC)
DC tests are used mainly to do “pressure tests” on high voltage cables. Although the cables operate with AC, AC testing is not practical. The high capacitance of the cables… Read more
Jun 01, 2013 | By Edvard Csanyi
Condition Monitoring of Transformers
It is possible to provide transformers with measuring devices to detect early signs of degradation in various components and provide warning to the operator in order to avoid a lengthy… Read more
May 24, 2013 | By Edvard Csanyi
Transformer Routine Dielectric (Insulation) Test
The following insulation tests are performed in order to meet the transformer insulation strength expectations. Unless otherwise requested by the customer, the following test are performed in the following order (IEC… Read more
May 23, 2013 | By Edvard Csanyi
Erection Procedure for Power Transformer
This technical article deals with transformers and their installation so we restrict ourselves here to the procedures associated with their commissioning. Transformers should be inspected for internal or external damage, particularly if… Read more
May 20, 2013 | By Edvard Csanyi
When a transformer has stomach pain and wants to…
During normal operation, transformer internal structures and windings are subjected to mechanical forces due to the magnetic forces. These forces are illustrated in Figure 1. By designing the internal structure very… Read more
May 08, 2013 | By Edvard Csanyi
Erection procedure for HV switchgear (Part 2)
Continued from first part: Erection procedure for HV switchgear (Part 1) Positioning of the cubicles should start near to the centre of the switchboard, installing as early as possible the… Read more
May 01, 2013 | By Edvard Csanyi
Erection procedure for HV switchgear (Part 1)
Before commencing erection of HV switchgear check that all connections are tight on busbars and on main circuits as well as auxiliary circuits. Examine the insulation very carefully, because there… Read more
Apr 29, 2013 | By Edvard Csanyi
Transformer Routine Test – Measurement of Voltage Ratio and Check of Phase Displacement
The no-load voltage ratio between two windings of a transformer is called turn ratio. The aim of measurement is: Confirming the no-load voltage ratio given in the customer order specifications,… Read more
Mar 02, 2013 | By Edvard Csanyi
Transformer Routine Test – Measurement Of No-Load Loss And Current
The no-load losses are very much related to the operational performance of a transformer. As long as the transformer is operated, these losses occur. For this reason, no load losses… Read more
Feb 18, 2013 | By Edvard Csanyi
Testing and Commissioning of MV/HV Cables
Compare cable data with drawings and specifications. Inspect exposed sections of cables for physical damage. Inspect bolted electrical connections for high resistance using one or more of the following methods: Use… Read more
Jan 12, 2013 | By Edvard Csanyi
Testing and Commissioning of Substation DC System
Power substation DC system consists of battery charger and battery. This is to verify the condition of battery and battery charger and commissioning of them. Following instruments will be used… Read more
Jan 09, 2013 | By Edvard Csanyi
Transformer routine test – The measurement of winding resistance
Measurement is made to check transformer windings and terminal connections and also both to use as reference for future measurements and to calculate the load loss values at reference (e.g…. Read more
Jan 05, 2013 | By Edvard Csanyi
Inspection and Test Procedures for Metal-Enclosed Busways
Visual and Mechanical Inspection Electrical Tests Test Values Test Values – Visual and Mechanical Test Values – Electrical Tables: TABLE 100.12 – US Standard Fasteners Bolt-Torque Values for Electrical Connections… Read more
Dec 22, 2012 | By Edvard Csanyi