This category includes dozens of articles about testing and commissioning low—medium—and high-voltage equipment and assemblies, such as circuit breakers, CTs, VTs, disconnectors, switchgear, transformers, electric motors, capacitor banks, etc. Special attention is given to testing procedures and identifying common mistakes that engineers make during testing.

Energy and Power

Testing Challenges in Large Ground Systems

Large ground systems, such as those found in substations and power stations, are an important part of the protection of the electricity supply network. They ensure that fault current will enable protective devices to operate correctly. A substation must have… Read more

Oct 12, 2015 | By

Testing Challenges in Large Ground Systems
Testing and Commissioning

Eight Recommended Periodic Inspections of a Substation Transformer

The following periodic tests and inspections are recommended for routine maintenance of the medium power substation transformer. Gauge readings Cooling fans Control wiring Paint finish Fluid dielectric test Bushing and surge arrester insulators Bushing terminals Gaskets Gauge readings, ambient temperature,… Read more

Sep 02, 2015 | By

8 Recommended Periodic Inspections of a Substation Transformer
Industrial Automation

4 Steps To Follow During Commissioning of a PLC System

Yes, PLC programs are never final, it is always possible to make corrections and subsequent adaptations to new system according the customer requirements. Even during commissioning, program changes are often necessary. The commissioning of a system can be divided into… Read more

Aug 15, 2015 | By

Testing and Commissioning

12 Transformer Factory Tests Briefly Explained

The remainder of the twelve factory tests are briefly summarized below. The details of the test set connections and formulas of some of the listed tests are already described in separatly published articles, and for the rest you are directed… Read more

Jun 29, 2015 | By

12 Transformer Factory Tests Briefly Explained
Testing and Commissioning

Procedure for transformer lightning impulse test

The purpose of the impulse voltage test is to secure that the transformer insultations withstand the lightning overvoltages which may occur in service. Where: C1 – Impulse capacitor Rc – Charging resistor Rs – Series resistor Ra – Low-ohmic discharging resistor for… Read more

Jun 12, 2015 | By

Procedure for transformer lightning impulse test
Maintenance

Maintenance and testing of overcurrent protective devices

When designing electrical distribution systems, required maintenance and testing of the overcurrent protective devices is a very important consideration. The electrical system reliability, component and circuit protection, and overall safety are directly related to the reliability and performance of the… Read more

May 04, 2015 | By

Maintenance and testing of the overcurrent protective devices


Learn How to Design Power Systems

Learn to design LV/MV/HV power systems through professional video courses. Lifetime access. Enjoy learning!

EEP Hand-Crafted Video Courses

Check more than a hundred hand-crafted video courses and learn from experienced engineers. Lifetime access included.
Experience matters. Premium membership gives you an opportunity to study specialized technical articles, online video courses, electrical engineering guides, and papers written by experienced electrical engineers.