Test On 110kV Power Cable After Installation (1)
Site test procedure covers all necessary electrical testing for the 110 kV cable and accessories to be carried out during and after installation of the cable system. This procedure is… Read more
Dec 22, 2014 | By Zafar Iqbal
Transformer routine test – Partial discharge measurement
This routine test aims to measure the partial discharges which may occur in the transformer insulation structure during test. Partial-discharges are electrical arks which form the surges between electrodes of… Read more
Dec 15, 2014 | By Edvard Csanyi
Testing of Power Transformer – Measurement of Zero-Sequence Impedance
The zero-sequence impedance is usually measured for all star-connected windings of the transformer. The measurement is carried out by supplying a current of rated frequency between the parallell connected phase… Read more
Jul 21, 2014 | By Edvard Csanyi
Why is continuous on-line monitoring of partial discharge in the switchgear necessary?
Not sure? You know that periodical maintenance test like partial discharge test can still leave switchgear in virtually unknown condition. Insulation defects and deterioration may very well develop in service… Read more
Jun 16, 2014 | By Edvard Csanyi
How to measure insulation resistance of a motor
If the motor is not put into operation immediately upon arrival, it is important to protect it against external factors like moisture, high temperature and impurities in order to avoid… Read more
Jun 09, 2014 | By Edvard Csanyi
Erection of earthing arrangements (TNC, TN-S, TNC-S, TT)
The earthing of low voltage networks in the UK is largely determined by the Low Voltage Supplies. However, if the incoming supplies are at 11kV and the transformers are in… Read more
Apr 07, 2014 | By Edvard Csanyi
Inspection and Test procedures for Instrument Transformers
Visual and Mechanical Inspection Electrical Tests: Electrical Tests – Current Transformers Electrical Tests – Voltage Transformers Electrical Tests – Coupling-Capacitor Voltage Transformers Electrical Tests – High-Accuracy Instrument Transformers (Reserved) Test… Read more
Apr 04, 2014 | By Edvard Csanyi
Testing of power transformer – Measurement of impedance voltage and load loss
The measurement is carried out to determine the load-losses of the transformer and the impedanse voltage at rated frequency and rated current. On Figure 1 above (Circuit for the impedance… Read more
Mar 12, 2014 | By Edvard Csanyi
Testing Procedures for HV Voltage Transformers
Equipment required for testing General inspection Insulation Resistance Test Polarity Test Transformer Turns ratio test Following equipment is necessary to perform testings: Polarity test kit Megger 500-5000V Ohmmeter Multimeter Autotransformers… Read more
Feb 28, 2014 | By Edvard Csanyi
Inspection and test procedures for Rotating Machinery, Synchronous Motors and Generators
Visual and Mechanical Inspection Electrical Tests Test Values Visual and Mechanical Tests Electrical Tests Pictures: Electrical machine wired for electrical testing The Electrical Machines Laboratory TABLE 100.10 – Maximum Allowable… Read more
Feb 19, 2014 | By Edvard Csanyi
Power Transformer Capacitance and Dissipation Factor Test
The capacitance and dissipation factor test is an AC low voltage maintenance test and is very similar to the power factor test. While the transformer preparation is identical to the… Read more
Jan 22, 2014 | By Edvard Csanyi
How to perform a power transformer turns ratio test
Power transformer turns ratio test is an AC low voltage test which determines the ratio of the high voltage winding to all other windings at no-load. The turns ratio test… Read more
Jan 17, 2014 | By Edvard Csanyi
Field Inspection and Testing of Medium-Voltage Motor Control Centres (MCCs)
Check MCC equipment for: alignment, levelness, and tightness of all bolting. Check all equipment for: removal of blocking, supports, temporary ties, and temporary wire jumpers. Check that all protective barriers… Read more
Oct 28, 2013 | By Edvard Csanyi
Eight important checks to do before powering up the dry-type transformer
The transformer should be powered up only after checking the following items: name plate ratings, parallel operation, connections: cables, busbars, tap change connections, grounding connection, thermal protective device, impurities removal… Read more
Oct 23, 2013 | By Edvard Csanyi
Testing and commissioning procedure for electric motors
It should be noted that the scope of motor testing depends upon the motor type and size, this being indicated on the inspection forms. Motor vibration shall be measured in… Read more
Sep 20, 2013 | By Edvard Csanyi