Search

Premium Membership ♕

Learn from experienced engineers and study specialized technical articles, studies & courses. Save 50% on courses with the Enterprise Plan.

Home / Download Center / Electrical Engineering Books and Technical Guides / Electrical engineering guides / Lecture Notes On Electrical Machines II (For Students B-Tech 4th Semester)

Parallel Operation of Alternators

The operation of connecting an alternator in parallel with another alternator or with common busbars is known as synchronizing. Generally, alternators are used in a power system where they are in parallel with many other alternators.

Lecture Notes On Electrical machines II (For B-Tech 4th semester)
Lecture Notes On Electrical machines II (For B-Tech 4th semester) – photo credit: Teelicht via Flickr

It means that the alternator is connected to a live system of constant voltage and constant frequency.

Often the electrical system, to which the alternator is connected, has already so many alternators and loads connected to it that no matter what power is delivered by the incoming alternator, the voltage and frequency of the system remain the same.

In that case, the alternator is said to be connected to infinite busbars.

Conditions

For proper synchronization of alternators, the following four conditions must be satisfied:

  1. The terminal voltage (effective) of the incoming alternator must be the same as busbar voltage.
  2. The speed of the incoming machine must be such that its frequency (= PN/60) equals busbar frequency.
  3. The phase of the alternator voltage must be identical with the phase of the busbar voltage.
  4. The phase angle between identical phases must be zero.

It means that the switch must be closed at (or very near) the instant the two voltages have correct phase relationship. Condition (1) is indicated by a voltmeter, conditions (2), (3) and (4) are indicated by synchronizing lamps or a synchronoscope.

Synchronizing lamp method
Figure 1 – Synchronizing lamp method

The synchronizing lamp method is consists of 3 lamps connected between the phases of the running 3-ph generator and the incoming generator as shown in Figure 1 above.

In three phase alternators, it is necessary to synchronize one phase only, the other two phases be will then synchronized automatically.

However, first it is necessary that the incoming alternator is correctly ‘phased out’ i.e. the phases are connected in the proper order of R, Y and B not R, B, Y etc. Lamp L1 is connected between R and R′, L2 between Y and B′ (not Y and Y′) and L3 between B and Y′ (and not B and B′) as shown in Figure 2.

Incoming alternator correctly ‘phased out’
Figure 2 – Incoming alternator correctly ‘phased out’

Two set of star vectors will rotate at unequal speeds if the frequencies of the two are different. If the incoming alternator is running faster, then voltage star R′ Y′ B′ appear to rotate anticlockwise with respect to the busbar voltage star RYB at a speed corresponding to the difference between their frequencies.

With reference to Figure 3, it is seen that voltage across L1 is RR′ to be increasing from zero, and that across L2 is YB′ which is decreasing, having just passed through its maximum, and that across L3 BY′ which is increasing and approaching its maximum.

Synchronizing lamp method
Figure 3 – Synchronizing lamp method

Hence the lamps will light up one after the other in the order 2, 3, 1, 2, 3, 1 or 1, 2, 3. If the incoming alternator is running slower, then the sequence of light up will be 1, 3, 2.

Synchronization is done at the moment the uncrossed lamp L1 is in the middle of the dark period and other two lamps are equally bright. Hence this method of synchronization is known as two bright one dark lamp method.

Title:Lecture Notes On Electrical machines II (For B-Tech 4th semester) – VSS University of Technology Burla, Sambalpur, Odisha,India
Format:PDF
Size:8.40 MB
Pages:180
Download:Right here | Video Courses | Membership | Download Updates
Lecture Notes On Electrical Machines II (For Students B-Tech 4th semester)
Lecture Notes On Electrical Machines II (For Students B-Tech 4th semester)

Premium Membership

Get access to premium HV/MV/LV technical articles, advanced electrical engineering guides, papers, and much more! It will help you to shape up your technical skills in your everyday life as an electrical engineer.
50% Discount 💥 - Save 50% on all 90+ video courses with Enterprise Membership plan.

More Information

2 Comments


  1. Shahil Soni
    May 02, 2022

    very nice


  2. MVG Sharma
    Dec 17, 2020

    I want to become a member of EEP. How can I pay for member ship fee in indian rupees?

Leave a Reply to Shahil Soni

Tell us what you're thinking. We care about your opinion! Please keep in mind that comments are moderated and rel="nofollow" is in use. So, please do not use a spammy keyword or a domain as your name, or it will be deleted. Let's have a professional and meaningful conversation instead. Thanks for dropping by!

nine  ×  one  =  

Learn How to Design Power Systems

Learn to design LV/MV/HV power systems through professional video courses. Lifetime access. Enjoy learning!

Subscribe to Weekly Newsletter

Subscribe to our Weekly Digest newsletter and receive free updates on new technical articles, video courses and guides (PDF).
EEP Academy Courses - A hand crafted cutting-edge electrical engineering knowledge