For Field Commissioning Staff

The interconnection of the electrical equipment and the equipment itself determines the dependability of any system. This handbook offers instructions for testing electrical systems according to National grid standards. Presumably, the extensive and thorough individual testing of the equipment has finished before the system’s commissioning started.

Electrical Testing and Commissioning Handbook
Electrical Testing and Commissioning Handbook (photo credit: Warna RS Sdn. Bhd.)

Nonetheless, usually the original proposal for the procurement of the equipment provides generic testing protocols for the components of the systems specified in this commissioning handbook. Apart from the advised testing below, one should follow the standards set by the equipment maker.

Every electrical system has several components, although some tests are universal throughout the equipment.

Based on the requirements and recommendation of international standards which shall be followed in strict norms as per the drawings, operation and maintenance manuals supplied by the Equipment manufacturer, these general procedures & norms in detail for accepting the equipment for their healthiness as per the specific component check, inspection and test are compiled in this manual.

Furthermore, this handbook seeks to fully provide one with knowledge on electrical tests, check lists, testing criteria, test forms, circuit connection diagrams needed for testing, Documented for review and future comparison with the outcomes of maintenance tests are the test procedures and test results.

This will act as a guide for the field commissioning staff to apply rigorous standards and method of testing that the contractor intends to follow per SEC transmission Construction Standards.

This handbook is meant to enable the commissioning personnel to efficiently complete pre-commissioning activities according to SEC Standard and specification before the equipment is brought to service condition.

Handbook Contents:

GIS and Switchgear:

  1. GIS EHV & HV Circuit Breaker Tests
  2. GIS EHV & HV Disconnect Switch Tests
  3. HV and Partial Discharge test on GIS Switchgear
  4. GIS Circuit Breaker Pole Discrepancy Scheme Check
  5. 13.8kV Switchgear Circuit Breaker Tests
  6. 13.8kV Switchgear Earthing Switch Tests
  7. 13.8kV Busbar Switchgear Tests
  8. 13.8kV Switchgear HV Tests
  9. Switchgear Ring Main Unit Tests
  10. Surge Arrester Tests
  11. Circuit Breaker Mechanism Tests

Current Transformer (CT):

  1. CT Insulation testing
  2. CT Turns Ratio Test
  3. CT Excitation (Kneepoint)
  4. CT Winding Resistance Test
  5. CT Voltage Withstand Test
  6. CT Polarity Check

Voltage Transformer (VT):

  1. VT Insulation testing
  2. VT Turns Ratio Test
  3. VT Excitation (Knee-point)
  4. VT Winding Resistance Test
  5. VT Voltage Withstand Test

Power Transformer:

  1. Measurement of Winding Insulation Resistance
  2. Measurement of Core and Frame Insulation at 1kV DC
  3. Winding Resistance Test
  4. Excitation Current(No Load) Test
  5. Short Circuit(%Z) Test
  6. Zero Sequence Impedance Test
  7. Turns Ratio Test
  8. Magnetic Balance Test
  9. Vector Group Test
  10. Tan Delta Test
  11. Oil Dielectric Breakdown Test
  12. Calibration of Oil & Winding Temperature Sensors
  13. Cooling Fan Tests
  14. Supervision Equipment Functional Checks
  15. On-Load Tap Changer MDU Check & Current Consumption
  16. Frequency Response Analysis

Grounding Transformer:

  1. GT Measurement of Winding Insulation Resistance
  2. Measurement of Core and Frame Insulation at 1kV DC
  3. Winding Resistance Test
  4. Calibration of Oil and Winding Temperature Sensors
  5. Tan Delta Test
  6. Oil Dielectric Breakdown Test
  7. Impedance Measurement
  8. Supervision Equipment Functional Checks
  9. Cooling Fan Tests

Shunt Reactor:

  1. Measurement of Winding Insulation Resistance
  2. Measurement of Core and Frame Insulation at 1kV DC
  3. Winding Resistance Test
  4. Calibration of Oil and Winding Temperature Sensors
  5. Tan Delta Test
  6. Oil Dielectric Breakdown Test
  7. Impedance Measurement
  8. Supervision Equipment Functional Checks
  9. Cooling Fan Tests

Capacitor Bank Testing & Commissioning

Static VAR Compensation System Commissioning

Automatic Voltage Regulator(AVR):

  1. AVR – Control Panel Scheme Check and Function
  2. AVR – Relay Configuration, Bandwidth and Timer Check
  3. AVR – Relay Blocking Protection Function Tests
  4. AVR – Digital Voltmeter

Battery Bank and Battery Charger:

  1. Battery Bank and Unit Testing
  2. Battery Charger Testing
  3. Battery Charger Testing – Functional Checks

AC Distribution Panel (ACDB):

  1. ACDB Panels – MCB and MCCB Tests
  2. ACDB Panels – Auxiliary Relays and Timers Test
  3. ACDB Panels – Other Component Test
  4. ACDB Panels – LV Automatic Transfer Switching Scheme Tests
  5. ACDB Panels – LV Automatic Transfer Switch Phase sequence Check and Phasing test

DC Distribution Panel (DCDB):

  1. DCDB Panels – MCB and MCCB Tests
  2. DCDB Panels – Auxiliary Relays and Timers Test
  3. DCDB Panels – Other Component Test

Transmission line and Power Cables:

  1. Phase Checking for Conductor & Sheath Test(@ 10kV DC)
  2. Capacitance and Insulation Resistance Measurement
  3. Conductivity and Continuity Test for Transmission Line Conductors
  4. Phase conductor insulation resistance test for Transmission Line
  5. Susceptance Test for Transmission Line
  6. Verification of Cross Bonding Test At Link Boxes
  7. Power Cable High Voltage Test
  8. Phase Checking for Transmission Line Conductors
  9. DC Conductor Resistance Earth Resistance Measurement
  10. SVL Insulation Resistance and Contact Resistance Test on Link Boxes
  11. Zero, Positive, & Negative Sequence Impedance Test
  12. Zero Sequence and Positive Sequence Impedance Tests for Transmission Lines

Meters:

  1. Testing & Commissioning of AMI
  2. Testing & Commissioning of Analog or Digital Meters

Protection Relays:

  1. Line & Cable Differential Protection Relay (87L_87C) Commissioning
  2. Circuit Breaker Fail (CBF) Protection Relay (50_62) Commissioning
  3. Bus Bar Protection Stability & Sensitivity Test
  4. Transformer Differential Protection relay (87T) Commissioning and Testing
  5. Transformer Differential Protection Stability & Sensitivity Test
  6. Reactor Differential Protection relay (87R) Commissioning and Testing
  7. Reactor Differential Protection Stability & Sensitivity Test
  8. Directional Negative Phase Sequence Overcurrent Relay (67Q) Test
  9. Directional Overcurrent and Earth Fault Protection relay (67_67N) Commissioning
  10. Over and Under Voltage Relay Test
  11. Restricted Earth Fault Protection Stability and Sensitivity Test
  12. Distance, Impedance Protection Relay (21) Commissioning
  13. Overcurrent, Undercurrent and Earth Fault Relay Test
  14. Over and Under Frequency Relay Test
  15. Trip Circuit Supervision Relay
  16. Synchronism Check (25) Relay Test
  17. Lock-out Relay(86) Test
  18. Auto-Recloser(79) Test
  19. CT Supervision Relay
  20. High Impedance Busbar Relay Test
  21. Capacitor Bank Protection Relay Test
  22. High Impedance Differential(87TEE) Relay Test
  23. Trip Coil Relay(94) Test
  24. End to End

Scheme Check:

  1. Scheme Check – General Instructions
  2. Automatic Bus Transfer System Scheme Check (ABTS)
  3. Automatic Capacitor Control Scheme Check (ACCS)
  4. Equipment Scheme

Substation Automation System (SAS):

  1. Prerequisite Work Instruction to start SAS Commissioning
  2. SAS Fiber Optic Cable Testing
  3. SAS Function Check of All Peripheral Devices
  4. SAS Measurement Testing
  5. SAS Engineering Workstation (EWS) Testing
  6. SAS Ethernet Switches Testing
  7. SAS Redundancy Testing
  8. SAS Gateways Testing
  9. SAS GPS Testing
  10. SAS IED’s Testing
  11. Maintenance Laptop Testing
  12. Operating Workstation Testing
  13. SAS Panels Inspection & Testing
  14. SAS Servers Testing
  15. SAS Function Testing
  16. SAS Overall Interlocking Testing
  17. Final Trip Test
  18. Relays Final Settings Review for EHV, HV, MV & SVC
  19. Normalization Before Energization
  20. Energization
Title:Electrical Commissioning and Testing Handbook – Khalid Hassan Gharib AND Enrique L. Labrador at Kingdom of Saudi Arabia – National Grid, Commissioning Services Department
Format:PDF
Size:33.1 MB
Pages:184
Download:Here 🔗 (Get Premium Membership) | Video Courses | Download Updates

Recommended Reading – Standard Operating Procedures (SOPs) for GIS Substations You MUST Fully Respect

Standard Operating Procedures (SOPs) for GIS Substations You MUST Fully Respect

Premium Membership

Get access to premium HV/MV/LV technical articles, advanced electrical engineering guides, papers, and much more! It will help you to shape up your technical skills in your everyday life as an electrical engineer.
50% Discount 💥 - Save 50% on all 90+ video courses with Enterprise Membership plan.

More Information

Learn How to Design Power Systems

Learn to design LV/MV/HV power systems through professional video courses. Lifetime access. Enjoy learning!

EEP Hand-Crafted Video Courses

Check more than a hundred hand-crafted video courses and learn from experienced engineers. Lifetime access included.
Experience matters. Premium membership gives you an opportunity to study specialized technical articles, online video courses, electrical engineering guides, and papers written by experienced electrical engineers.