Precision time synchronization

Almost all substation protection and control applications require accurate time-stamping. The performance of systems such as Network Time Protocol (NTP), IRIG-B and one pulse per second (1-PPS) have been sufficient to date. However, new applications, including IEC 61850-9-2 process bus and phasor measurement, require accuracy of 1 μs or better.

Timing precision and real-time data networks for digital substation automation
Timing precision and real-time data networks for digital substation automation (photo credit: hesg.com.au)

Furthermore, process bus applications are taking time synchronization out into high voltage switchyards where cable lengths may have an impact on timing accuracy.

IEEE Std 1588, Precision Time Protocol (PTP), is the means preferred by the smart grid standardization roadmaps (from both the IEC and US National Institute of Standards and Technology) of achieving this higher level of performance, and integrates well into Ethernet based substation automation systems.

Significant benefits of PTP include automatic path length compensation, support for redundant time sources and the cabling efficiency of a shared network.

This paper benchmarks the performance of established IRIG-B and 1-PPS synchronization methods over a range of path lengths representative of a transmission substation. The performance of PTP using the same distribution system is then evaluated and compared to the existing methods to determine if the performance justifies the additional complexity.

Experimental results show that a PTP timing system maintains the synchronizing performance of 1-PPS and IRIG-B timing systems, when using the same fibre optic cables, and further meets the needs of process buses in large substations.

Transformer differential protection with (a) two merging units and (b) one merging unit and one conventional input.
Figure 1 – Transformer differential protection with (a) two merging units and (b) one merging unit and one conventional input.

Substation Application

The high voltage equipment in a substation (for example busbars, circuit breakers, isolators, earth switches, power transformers, current transformers and voltage transformers) is referred to as the ‘primary plant’.

The control equipment in a substation is termed the substation automation system (SAS), and includes protection, control, automation and monitoring devices. A ‘process bus’ carries sampled value measurements and status information from the primary plant to the SAS, and conveys commands from the SAS to the high voltage circuit equipment (e.g. circuit breakers and transformer tap change controllers), over a digital network.

Merging units (MUs) sample the output of conventional current transformers and voltage transformers and transmit this information over the process bus.

Secondary converters (SCs) convert the proprietary output of Non-Conventional Instrument Transformers (such as optical or electronic transducers) into a standard form that then connects to the SAS.

IEC 61850-9-2 defines an interoperable format for the sampled value output of MUs and SCs using a process bus. Some protection schemes, in particular transformer protection, require inputs from either two or more MUs/SCs, or from process bus and conventional analogue inputs.

Intelligent electronic devices (IEDs) require that the current/voltage samples are synchronized. Any synchronizing error (regardless of method used) will manifest as phase error, and this in turn gives ‘spill current’ in differential protection schemes, increasing the chance of false tripping.

Figure 1 (above) shows two example configurations where this is required.

Title:Assessment of precision timing and real-time data networks for digital substation automation – Ingram, David M.E.; Queensland University of Technology
Format:PDF
Size:16.8 MB
Pages:210
Download:Right here | Video Courses | Membership | Download Updates
Digital substation automation - Timing precision and real-time data importance
Digital substation automation – Timing precision and real-time data importance

Premium Membership

Get access to premium HV/MV/LV technical articles, advanced electrical engineering guides, papers, and much more! It will help you to shape up your technical skills in your everyday life as an electrical engineer.
50% Discount 💥 - Save 50% on all 90+ video courses with Enterprise Membership plan.

More Information

2 Comments


  1. Washington Foronda
    Dec 06, 2019

    Informative..


  2. Wele Didier
    Aug 06, 2019

    I am delighted and interested with your subjects . soon I will do my industrial project in electrical engineering.

Leave a Reply to Wele Didier

Tell us what you're thinking. We care about your opinion! Please keep in mind that comments are moderated and rel="nofollow" is in use. So, please do not use a spammy keyword or a domain as your name, or it will be deleted. Let's have a professional and meaningful conversation instead. Thanks for dropping by!

seven  +  3  =  

Learn How to Design Power Systems

Learn to design LV/MV/HV power systems through professional video courses. Lifetime access. Enjoy learning!

Subscribe to Weekly Newsletter

Subscribe to our Weekly Digest newsletter and receive free updates on new technical articles, video courses and guides (PDF).
EEP Academy Courses - A hand crafted cutting-edge electrical engineering knowledge