Home / Download Center / Electrical Engineering Books and Technical Guides / Power substation guides / Preventive maintenance of substation equipment and transmission lines

Gas insulated substation

The main advantage of Gas Insulated Substation (GIS) is its high reliability and also compactness which has direct influence on land requirement, land cost, environmental considerations, etc. The initial equipment cost of GIS is usually higher than that of conventional Air Insulated Substation (AIS).

Preventative maintenance of substation equipment and transmission lines
Preventative maintenance of substation equipment and transmission lines

The advantage and life cycle cost analysis are generally considered before deciding for GIS. The land area required for a GIS substation is in the order of 10% to 20% of that for an AIS substation considering the switchgear bay.

The saving in overall land area depends very much on the specific voltage level and the connection to transformers, reactors and incoming and outgoing lines. If the substation is connected to overhead lines, then space will have to be allocated for towers and droppers which might reduce the total land saving.

Indoor and underground GIS is possible even in urban and highly populated areas which will allow building of the substation at the point of consumption which will bring about significant cost savings in the distribution network.

GIS also is considered for severe environment conditions, where saline pollution near coastal areas or industrial pollution requiring regular cleaning of insulators and corrosion of metallic components and electrical joints. GIS being totally enclosed units shall be immune to these severities.

GIS is also adopted when substation is to be installed at very high altitudes or very low temperatures or seismic considerations and hydro stations.


Maintenance of GIS

Before taking up the maintenance of GIS, recommended safety rules from the manufacturer are required to be adhered to. Some of them are listed below but, it is recommended to integrate with recommendations of manufacturer of GIS.


Recommendation #1

The maintenance programme and time based intervals specified/no. of operations whichever is earlier to form the basis of maintenance.


Recommendation #2

Whenever maintenance is taken up, it is essential to:

  1. Employ the authorized personal
  2. Define and discuss in advance the maintenance to be performed and the relative hazards. Proper formatted record sheets to be prepared.
  3. Use parts only supplied by Original Equipment Manufacturers (OEM).
  4. It is necessary to identify the equipment which is required to be maintained. Ensure that it is in deenergized/degassed condition.
  5. It is essential to make sure that the equipment is earthed on all sides of the work-zone.
  6. The work-zone should be barricaded and operator should have necessary protective clothing and recommended safety devices.
  7. It is required to be ensured that necessary maintenance equipment such as slings, platforms, scaffoldings and electrical equipments/tools are in proper shape.

Conditions Monitoring of GIS

Generally GIS requires no or very little maintenance and monitoring the SF6 gas pressure and quality is considered sufficient.

For maintenance of the GIS, regular inspections, Routine scheduled maintenance and overhaul maintenance are specified by the manufactures. The maintenance to be carried out and their periodicity is indicated in the “Maintenance Schedule”.

Manufacturer’s instructions are to be followed for special tests, if any, for that particular make of GIS substation.


SF6 Gas

As SF6 gas is used in all chambers of GIS the monitoring of pressure and quality is of the importance. As per IEC 62271-203 the leakage rate from any single compartment of GIS to atmosphere and between compartments shall not exceed 0.5% per year for the service life of the equipment.

The pressure inside a GIS may vary from the rated filling pressure level due to different service conditions. Pressure increase due to temperature and leakage between compartments may impose additional mechanical stresses.

Pressure decrease due to leakage may reduce he insulation properties.

Title:Preventative maintenance of substation equipment and transmission lines – Power Transmission Corportation Of Uttarakhand Ltd.
Format:PDF
Size:739.6 KB
Pages:159
Download:Right here | Video Courses | Membership | Download Updates
Preventive maintenance of substation equipment and transmission lines
Preventive maintenance of substation equipment and transmission lines

Premium Membership

Get access to premium HV/MV/LV technical articles, advanced electrical engineering guides, papers, and much more! It will help you to shape up your technical skills in your everyday life as an electrical engineer.
50% Discount 💥 - Save 50% on all 90+ video courses with Enterprise Membership plan.

More Information

10 Comments


  1. Alex Ichide
    Oct 06, 2019

    Thanks for all your post, I like being a member of premium when I have the money to pay. Thanks


  2. Aniket Pihulkar
    Oct 02, 2019

    It’s really useful for the maintenance purpose for a person who is working newly on GIS


  3. Rushi Solanki
    Oct 01, 2019

    I m not able to download’ Preventative maintenance of substation equipment and transmission lines ‘ this content can u plz send it to my mail


  4. S.K.Karwasra
    Oct 01, 2019

    It is very usefull for maintenance as well as safety


  5. Kumaran
    Oct 01, 2019

    Very useful to learn the topics posted here


  6. Vikram Kumar
    Oct 01, 2019

    Have you job for maintenance. I have iti in fitter and one year experience.
    Thank you


  7. Ishwar Kolaki
    Oct 01, 2019

    Article is useful to Electrical engineers


  8. J. Espinoza
    Oct 01, 2019

    On GIS systems, when there is a leakage on the system, what could be the best refill procedures to do? On Siemens substation breakers 92kv


  9. RHrao
    Oct 01, 2019

    How to find sf6 leakage before pressure dropped.


  10. Abebe Lemma
    Sep 30, 2019

    Really, I have no word to thank this portal. Eventhough i am not a premium membership i follow what U post which is very useful and important technical articles
    I can’t even begin to explain how much your help meant to me. Thanks a lot

Leave a Reply to J. Espinoza

Tell us what you're thinking. We care about your opinion! Please keep in mind that comments are moderated and rel="nofollow" is in use. So, please do not use a spammy keyword or a domain as your name, or it will be deleted. Let's have a professional and meaningful conversation instead. Thanks for dropping by!

eighty six  −    =  85

Learn How to Design Power Systems

Learn to design LV/MV/HV power systems through professional video courses. Lifetime access. Enjoy learning!

Subscribe to Weekly Newsletter

Subscribe to our Weekly Digest newsletter and receive free updates on new technical articles, video courses and guides (PDF).
EEP Academy Courses - A hand crafted cutting-edge electrical engineering knowledge