Testing Substation Equipment
This instruction manual comprises a complete description of the testing and commissioning of various electrical equipment installed in power substations. Each procedure includes the task, preconditions (work Status, needed documentation, involved personnel and measuring instrument used for testing), precautions, testing scope and execution (visual and other checks).
- Current Transformer
- Voltage Transformer
- Ammeter
- Voltmeter
- Energy Meter
- Power Factor Meter
- Power Meter
- Current Transducer
- Voltage Transducer
- Power Transducer
- Over Current Relay
- Voltage Relay
- Synch-check Relay
- Current Differential Relay
- Tripping Relay
- DC Supervision Relay
- Trip Coil Supervision Relay
- Timing Relay
- Distribution Transformer
- Power Transformer
- Current Limiting Reactor
- Low Voltage Circuit Breaker
- Medium Voltage Circuit Breaker
- Medium Voltage Disconnect Switch
- Low Voltage Bus Bar
- Medium Voltage Bus Bar
- Low Voltage Bus Duct
- Medium Voltage Bus Duct
- Induction Motor
- AC Generator
- Low Voltage Cable
- Medium Voltage Cable
- Liquid Batteries
- Lux Level Measurement
- DC Distribution Board
- AC Motor Control Center(MCC)
- Grounding System
Title: | Testing and Commissioning Procedures for Substation Equipment – BEMCO Services |
Format: | |
Size: | 8.8 MB |
Pages: | 286 |
Download: | Here 🔗 (Get Premium Membership) | Video Courses | Download Updates |
Further Study – Practical guidelines for protection system engineering
good
PLEASE SEND THE DETAILS CABLE SCHEDULING OF 220/33KV 100MVA SUBSTATION SOLAR PARK
WHAT IS ESPECIAL LLY TAKE CARE IN SOLAR PARK POOLING SUB STATION
I need a advance electrical engineer training but I am in Nigeria I don’t know how to do it and I don’t need online training please what can I do
These articles are meaningful resource for electrical engineers and help us to keep abreast with emerging concepts and technologies in this 21st Century.
Excellent article about this important subject. Thanks.