Introduction to PLC ladder diagrams

As an introduction to ladder diagrams, consider the simple wiring diagram for an electrical circuit in Figure 1a. The diagram shows the circuit for switching on or off an electric motor.

PLC Ladder Diagrams for Electrical Engineers - Beginners
PLC Ladder Diagrams for Electrical Engineers - Beginners (photo credit: wordsun.com)

We can redraw this diagram in a different way, using two vertical lines to represent the input power rails and stringing the rest of the circuit between them.

Figure 1b shows the result. Both circuits have the switch in series with the motor and supplied with electrical power when the switch is closed.

The circuit shown in Figure 1b is termed a ladder diagram.

Ways of drawing the same electrical circuit
Figure 1 – Ways of drawing the same electrical circuit

With such a diagram the power supply for the circuits is always shown as two vertical lines with the rest of the circuit as horizontal lines. The power lines, or rails as they are often termed, are like the vertical sides of a ladder with the horizontal circuit lines like the rungs of the ladder. The horizontal rungs show only the control portion of the circuit.

In the case of Figure 1 it is just the switch in series with the motor. Circuit diagrams often show the relative physical location of the circuit components and how they are actually wired.

With ladder diagrams no attempt is made to show the actual physical locations and the emphasis is on clearly showing how the control is exercised.

Figure 2 (see below) shows an example of a ladder diagram for a circuit that is used to start and stop a motor using push buttons. In the normal state, push button 1 is open and push button 2 closed.

Figure 2 - Stop-start switch
Figure 2 – Figure 2 – Stop-start switch

When button 1 is pressed, the motor circuit is completed and the motor starts. Also, the holding contacts wired in parallel with the motor close and remain closed as long as the motor is running. Thus when the push button 1 is released, the holding contacts maintain the circuit and hence the power to the motor. To stop the motor, button 2 is pressed. This disconnects the power to the motor and the holding contacts open. Thus when push button 2 is released, there is still no power to the motor.

Thus we have a motor which is started by pressing button 1 and stopped by pressing button 2.


PLC Ladder Programming

A very commonly used method of programming PLCs is based on the use of ladder diagrams. Writing a program is then equivalent to drawing a switching circuit.

The ladder diagram consists of two vertical lines representing the power rails. Circuits are connected as horizontal lines, i.e., the rungs of the ladder, between these two verticals.

In drawing a ladder diagram, certain seven conventions are adopted:

Convention 1 //

The vertical lines of the diagram represent the power rails between which circuits are connected. The power flow is taken to be from the left-hand vertical across a rung.

Convention 2 //

Each rung on the ladder defines one operation in the control process.

Convention 3 //

A ladder diagram is read from left to right and from top to bottom, Figure 3 showing the scanning motion employed by the PLC. The top rung is read from left to right. Then the second rung down is read from left to right and so on.

Scanning the ladder program
Figure 3 – Scanning the ladder program

When the PLC is in its run mode, it goes through the entire ladder program to the end, the end rung of the program being clearly denoted, and then promptly resumes at the start. This procedure of going through all the rungs of the program is termed a cycle. The end rung might be indicated by a block with the word END or RET for return, since the program promptly returns to its beginning.

Convention 4 //

Each rung must start with an input or inputs and must end with at least one output. The term input is used for a control action, such as closing the contacts of a switch, used as an input to the PLC. The term output is used for a device connected to the output of a PLC, e.g., a motor.

Convention 5 //

Electrical devices are shown in their normal condition. Thus a switch, which is normally open until some object closes it, is shown as open on the ladder diagram. A switch that is normally closed is shown closed.

Convention 6 //

A particular device can appear in more than one rung of a ladder. For example, we might have a relay that switches on one or more devices. The same letters and/or numbers are used to label the device in each situation.

Convention 7 //

The inputs and outputs are all identified by their addresses, the notation used depending on the PLC manufacturer. This is the address of the input or output in the memory of the PLC.

Basic symbols
Figure 4 – Basic symbols

Figure 4 shows standard IEC 1131-3 symbols that are used for input and output devices. Some slight variations occur between the symbols when used in semi-graphic form and when in full graphic.

Note that inputs are represented by different symbols representing normally open or normally closed contacts. The action of the input is equivalent to opening or closing a switch. Output coils are represented by just one form of symbol.

To illustrate the drawing of the rung of a ladder diagram, consider a situation where the energizing of an output device, such as a motor, depends on a normally open start switch being activated by being closed. The input is thus the switch and the output the motor. Figure 5a shows the ladder diagram.

A ladder rung
Figure 5 – A ladder rung

Starting with the input, we have the normally open symbol j j for the input contacts. There are no other input devices and the line terminates with the output, denoted by the symbol ( ). When the switch is closed, i.e., there is an input, the output of the motor is activated.

Only while there is an input to the contacts is there an output. If there had been a normally closed switch | / | with the output (Figure 5b), then there would have been an output until that switch was opened. Only while there is no input to the contacts is there an output. In drawing ladder diagrams the names of the associated variable or addresses of each element are appended to its symbol.

Notation: (a) Mitsubishi (b) Siemens (c) Allen-Bradley (d) Telemecanique (Schneider Electric)
Figure 6 – Notation: (a) Mitsubishi (b) Siemens (c) Allen-Bradley (d) Telemecanique (Schneider Electric)

Thus Figure 6 shows how the ladder diagram of Figure 5a would appear using (a) Mitsubishi, (b) Siemens, (c) Allen-Bradley, (d) ex Telemecanique (Schneider Electric) notations for the addresses. Thus, Figure 6a indicates that this rung of the ladder program has an input from address X400 and an output to address Y430.

When wiring up the inputs and outputs to the PLC, the relevant ones must be connected to the input and output terminals with these addresses.


Programmable Logic Controller Basics (VIDEO)

Continue reading:
PLC Ladder Logic Functions for Electrical Engineers (Beginners)

Reference // Ladder and Functional Block Programming – W. Bolton (Purchase at Amazon)

Premium Membership

Get access to premium HV/MV/LV technical articles, electrical engineering guides, research studies and much more! It helps you to shape up your technical skills in your everyday life as an electrical engineer.
More Information
Edvard Csanyi - Author at EEP-Electrical Engineering Portal

Edvard Csanyi

Hi, I'm an electrical engineer, programmer and founder of EEP - Electrical Engineering Portal. I worked twelve years at Schneider Electric in the position of technical support for low- and medium-voltage projects and the design of busbar trunking systems.

I'm highly specialized in the design of LV/MV switchgear and low-voltage, high-power busbar trunking (<6300A) in substations, commercial buildings and industry facilities. I'm also a professional in AutoCAD programming.

Profile: Edvard Csanyi

4 Comments


  1. Anzan Aboobucker
    Sep 21, 2023

    very useful


  2. Harry Hanekamp
    Nov 06, 2018

    Excellent material for training purposes


  3. prit
    Dec 08, 2015

    I want to know about waste water treatment plant operation


  4. Ramakanta
    Nov 30, 2015

    Mitsubishi, Siemens,Allen-Bradley and Schneider Electric there are notations for the addresses like X400 , Y430 etc, what does it represent??

Leave a Comment

Tell us what you're thinking. We care about your opinion! Please keep in mind that comments are moderated and rel="nofollow" is in use. So, please do not use a spammy keyword or a domain as your name, or it will be deleted. Let's have a professional and meaningful conversation instead. Thanks for dropping by!

three  ×    =  twenty one

Learn How to Design Power Systems

Learn to design LV/MV/HV power systems through professional video courses. Lifetime access. Enjoy learning!

EEP Hand-Crafted Video Courses

Check more than a hundred hand-crafted video courses and learn from experienced engineers. Lifetime access included.
Experience matters. Premium membership gives you an opportunity to study specialized technical articles, online video courses, electrical engineering guides, and papers written by experienced electrical engineers.