Home / Technical Articles / Qatar General Electricity and Water Corporation – Recommendations for Safety Clearance
Qatar General Electricity and Water Corporation - Recommendations for Safety Clearance
Qatar General Electricity and Water Corporation (Kahramaa) has awarded Leighton Contracting Qatar, a subsidiary of Australia’s HLG, the contract to carry out the work at Al Duhail and Umm Qarn reservoir and pumping stations. Qatar will build nine six million gallon reservoirs and one 25 million gallon reservoir. (photo from bigprojectme.com)

Minimum Safety Clearance of Pipelines from Electrical Tower

ServiceVertical Clearance (Min)
Water Line (to cross below EHV cable level)0.5 Meter
Sewerage Mains (to cross below EHV cable level)1.0 Meter
Drainage Mains (to cross below EHV cable level)0.5 Meter
Gas pipes0.6 Meter
Telephone lines0.5 Meter
LV / 11kV cables0.5 Meter

Safety Clearance for Excavation of Land

Voltage kVMin. Distance
380/220V0.5 Meter
20KV2 Meter
63KV7 Meter
132KV10 Meter
230KV and above20 Meter

Distance between underground power cables to wall of gas pipelines in parallel routes

Voltage kVMin. Horizontal DistanceMin. Vertical Distance
380/220V1 Meter0.5 Meter
20KV2 Meter1 Meter
63KV3 Meter1.5 Meter

(B) Outside of Towns

Distance between Tower’s foundation to Pipeline in parallel and intersections

Voltage KVMin. Distance in Parallel Route
(Up to 5 Km)
Min. Distance in Parallel Route
(Above 5 Km)
20KV20 Meter30 Meter
63KV30 Meter40 Meter
132KV40 Meter50 Meter
230KV50 Meter60 Meter
400KV60 Meter60 Meter

Distance between overhead lines to gas pipelines at intersections

Voltage KVMin. Distance
20KV8 Meter
63KV9 Meter
132KV10 Meter
230KV11 Meter
400KV12 Meter

Distance between Tower’s foundations to gas pipelines at intersections

 Voltage KVMin. Distance
20KV20 Meter
63KV and higher30 Meter

Right Of Way (R.O.W) From Roads

HighwayDistance
High Way: (38 meter from one side of Central Line of Highway)76 Meter
First Class State Road=(22.5 meter from one side of Central Line of Highway)45 Meter
Second Class State Road=(17.5 meter from one side of Central Line of Highway)35 Meter
Third Class State Road =(12.5 meter from one side of Central Line of Highway)25 Meter
Forth Class State Road=(7.5 meter from one side of Central Line of Highway)15 Meter

General Electrical Safety Clearance

Voltage KVDescriptionDistance
Up to 11 KVAt points where the lines cross roads or railwaysMin 6 Meter Height
Up to 11 KVParallel to the roadsMin 5.5 Meter Height
Up to 11 KVLines cross totally desert regions where no traffic is possibleMin 5.5 Meter Height
20 KV to 66 KVAll LocationMin 6 Meter Height
Up to 11 KVConductor JointNo joint shall be closer than 3 meters to a point of support
33 KV & 66 KVConductor JointNo tension joints shall be used unless specially approved.

Premium Membership

Get access to premium HV/MV/LV technical articles, electrical engineering guides, research studies and much more! It helps you to shape up your technical skills in your everyday life as an electrical engineer.
More Information
author-pic

Jignesh Parmar

Jignesh Parmar has completed M.Tech (Power System Control), B.E (Electrical). He is member of Institution of Engineers (MIE), India. He has more than 20 years experience in transmission & distribution-energy theft detection and maintenance electrical projects.

6 Comments


  1. SHYAM KOTLA
    Nov 14, 2018

    Dear sir

    Natural gas pipeline can be laid below the 66 KVA lines and what is the minimum distance should be maintained between tower footing and gas pipeline. what Precautionery measures to protect the pipelines laid near high tension power lines .

    Regards

    S.P.Kotla


  2. SHYAM KOTLA
    Nov 14, 2018

    Dear sir

    Please clarify natural gas pipeline can be laid below the 66 KVA lines and what is the minimum distance should be maintained between tower footing and gas pipeline. Precautionery measures to protect the pipelines laid near high tension power lines .

    Regards

    S.P.Kotla


  3. rachel
    Mar 28, 2015

    sir what is the distance between overhead line and traction system upto voltage of 33 KV?


  4. Mohamed
    Feb 23, 2015

    What is the reference for the attached information ? did you get it from KAHRAMAA standards ?? can send to me the reference of these information ,
    I tried to use it against the contractor , but the contractor told me that what is your reference !!!


  5. Saurabh Dubey
    Sep 25, 2012

    Hello sir
    I want to know about improving power factor.Suppose that we have a DG of 1000kw and the power factor is .7.If we want to change our power factor to .9 Then with help of capacitor bank how we can do it.Which How we find that which Capacitor bank we should use.

Leave a Reply to SHYAM KOTLA

Tell us what you're thinking. We care about your opinion! Please keep in mind that comments are moderated and rel="nofollow" is in use. So, please do not use a spammy keyword or a domain as your name, or it will be deleted. Let's have a professional and meaningful conversation instead. Thanks for dropping by!

three  +  two  =  

Learn How to Design Power Systems

Learn to design LV/MV/HV power systems through professional video courses. Lifetime access. Enjoy learning!

Subscribe to Weekly Newsletter

Subscribe to our Weekly Digest newsletter and receive free updates on new technical articles, video courses and guides (PDF).
EEP Academy Courses - A hand crafted cutting-edge electrical engineering knowledge