Improving voltage profile of feeders

In this paper, a load flow analysis is performed to a 138/69 kV substation using ETAP software (shortener for Electrical Transient & Analysis Program). The scope of this report encompasses the load flow results, and explains how these were used to implement changes on the feeders that resulted in an improved voltage profile.

Load flow analysis of 138/69 kV substation using ETAP (Electrical Transient & Analysis Program)
Load flow analysis of 138/69 kV substation using ETAP (Electrical Transient & Analysis Program)

The substation layout and equipment choice were provided by Black & Veatch (B&V) as part of a Senior Design project. In this context, the load flow study is performed for different operating conditions or scenarios to determine what control measurements are necessary to prevent system breakdown.

The results of the load flow study for the different scenarios, will be substituted into power flow equations destined to improve the power factor of a given bus. The equations define the relationship of the real and reactive power with the desired power factor.

They yield the updated size of fixed or switched shunt capacitor banks required to compensate the inductive effect of the loads. To verify that the theoretical results are accurate, the load flow is performed with the updated parameters for the capacitor banks.

As introduced earlier, the power flow study for this substation will be performed on ETAP. The acronym ETAP stands for Electrical Transient and Analysis Program.

This software is a comprehensive platform for the design, simulation, and protection of electrical networks.

Load Flow Simulation for Unchanged Conditions
Load Flow Simulation for Unchanged Conditions

ETAP not only provides solutions to substation designs, but also specializes in generation, transmission, and distribution of power systems.

The software relies on predictive simulation. This allows the user to perform analysis using real-time system parameters and may also simulate β€œwhat if” scenarios to predict equipment malfunctioning.

ETAP also uses preventive simulation, which allows the user to see any automated alarms and warnings. These alarms and warnings are based on events that could potentially occur (generator outages/contingencies) and corrective action will be suggested. It analyses are always verified and validated against field results, real system measurements, and hand calculations.

The one-line diagram of the electrical system in question is composed by several pieces of equipment, each with a specific function. All of the components for this substation are high-voltage components.

Some of the most important components are:

  • Power source,
  • Disconnect switches,
  • Circuit breakers,
  • Capacitor banks,
  • Transmission lines,
  • Power transformers,
  • Potential (voltage) transformers, and
  • Current transformers.

The layout for the substation and the operation parameters for each component on the one-line were specified in the documentation provided by Black & Veatch, with the exception of the transmission line parameters. The process of choosing the most suitable type of conductors for the transmission lines is also discussed in this thesis.


Performing load flow analysis

For a deeper understanding of this thesis, it is important to cover important information about the load flow analysis. The load flow is analysis is performed to determine whether the system voltages operate within the specified voltage limits under normal or fault operating conditions.

It is used to determine the voltage drop at different points of the system, the voltage reading at each bus, and real and reactive power losses through each branch and feeder. ETAP creates warnings if a feeder bus is below the nominal voltage.

Likewise, the load flow study is often performed to identify the need for additional generation units, and the addition or replacement of capacitors and/or reactors to maintain system voltages within specified limits.

Title:Load flow analysis of 138/69kV substation using ETAP software – Vanessa Abadia Gomez, College of Engineering, Department of Electrical Engineering, University of Arkansas, Fayetteville
Format:PDF
Size:905 KB
Pages:23
Download:Here πŸ”— (Get Premium Membership) | Video Courses | Download Updates
Load flow analysis of 138/69 kV substation using ETAP (Electrical Transient & Analysis Program)
Load flow analysis of 138/69 kV substation using ETAP (Electrical Transient & Analysis Program)

Premium Membership

Get access to premium HV/MV/LV technical articles, advanced electrical engineering guides, papers, and much more! It will help you to shape up your technical skills in your everyday life as an electrical engineer.
50% Discount πŸ’₯ - Save 50% on all 90+ video courses with Enterprise Membership plan.

More Information

5 Comments


  1. Mostafa Kamal
    Aug 12, 2020

    Dear concern
    I am going to install one 2000 KVA substation in DHAKA , Bangladesh. now my question is
    1. Can I set it in the Basement floor instead of Ground Floor?
    2. Can I install 610- kva Generator outside the building ?
    3. What are the test to be conducted before I take over the setup from the supplier? The equipment are fro Siemens, Germany.
    Best Regards
    Mostafa Kamal
    12, August, 2020


    • Syamprasad
      Feb 05, 2024

      I am from India and trying to purchase the course on surge protection device ( SPDS ). But I am not able to go to the check-out.

      Is it required to have a premium membership for purchase of any course???

      Please reply with complete details or a payment link.

      Syam Prasad
      [email protected].
      India


  2. Gebrehiwot gebru
    Aug 10, 2020

    i need this software i have taken this software in fiveth year when i was a studen. anyway this is fantastic course in ece especially power stream


  3. Bonginkosi
    Apr 20, 2020

    Morning sir/madam

    I would like to request more information about fixing transformer if ever is not supplying power to another, also any kind electrical problem, thank you
    Regards
    B. Mdazo


  4. zeggai amine
    Aug 19, 2019

    Thank you for this information
    Best regards

Leave a Reply to Mostafa Kamal

Tell us what you're thinking. We care about your opinion! Please keep in mind that comments are moderated and rel="nofollow" is in use. So, please do not use a spammy keyword or a domain as your name, or it will be deleted. Let's have a professional and meaningful conversation instead. Thanks for dropping by!

8  +    =  sixteen

Learn How to Design Power Systems

Learn to design LV/MV/HV power systems through professional video courses. Lifetime access. Enjoy learning!

Subscribe to Weekly Newsletter

Subscribe to our Weekly Digest newsletter and receive free updates on new technical articles, video courses and guides (PDF).
EEP Academy Courses - A hand crafted cutting-edge electrical engineering knowledge