Electric arc furnaces

Electric arc furnaces are considered as being one of the worst source of fluctuations on a power supply system. The load cycles of arc furnaces vary widely, depending on size and metallurgical requirements.

Whatā€™s the worst source of fluctuations on a power supply system?
Whatā€™s the worst source of fluctuations on a power supply system? (on photo: 11kV electric arc furnace; by Willie Putter via Flickr)

The first part of the cycle consists of melt-down period when the solid charge is melted and the main energy input needed. The later part of the cycle is known as the refining period; in this, energy supplied has only to make good the heat losses. A considerable movement of the charge occurs during the melt-down period with consequent variations in the arc lengths on each phase.

The two main causes of fluctuation are believed to be first, the movement of the arcs as flexible conductors in a magnetic field and in some cases their extinction and restriking; secondly, the short circuiting of the graphite electrodes by scrap movement.

When the fluctuating currents pass through the power supply network impedance, a corresponding fluctuation is set up in the supply voltage at the point of common coupling with other consumers (p.c.c.). Visible light flicker is due to power system voltage fluctuation.

The fluctuations in the three phases are, moreover, unbalanced.

During melting period the arc furnaces also create harmonics. Arc furnaces are designed to operate at low power factor say 0.7 and 0.8. When the electrode is usually driven into the scrap metal, it produces a dead short circuit on one phase.

The total harmonic distortion calculated for voltages (THDU) and currents (THDI) in the melting phase
The total harmonic distortion calculated for voltages (THDU) and currents (THDI) in the melting phase

During arc furnace short-circuit, arc furnace demands larger reactive power from the electricity supply, in turn a larger voltage dip is produced on the system.

The current and voltage harmonic distortion causes several problems in electrical power systems, such as incorrect operation of devices, premature ageing of equipment, additional losses in transmission and distribution networks, overvoltages and overcurrents.

The flicker phenomenon does not very much affect the electric equipment, but a physiological uneasiness in vision occurs due to electric lightning flux fluctuations, which are particularly important with incandescent lamps.

Therefore, it is of crucial importance to predict these effects when an arc furnace is to be connected to a network or when an existing furnace is to be upgraded.


Static VAr compensator

To reduce harmonic injection into the system, to improve the power factor of the arc furnace during melting, to support the power supply system for VAr compensation during arc furnace short-circuit, and to balance the three-phases, a reactive VAr compensator is needed.

The static VAr compensator should be capable of supporting the system for the dynamic reactive VAr swing requirement due to arc furnaces swing from open circuit to short circuit.

Single-line diagram (Arc Furnace SVC)
Figure 2 – Single-line diagram (Arc Furnace SVC) – source: ABB

The SVC offers an efficient means to rectify these shortcomings as it will keep up a high and stable voltage on the furnace bus, thereby contributing to productivity and economy of the process. The overall power factor correction for the plant provided by the SVC will also contribute in a favourable way
to process economy.

At the same time, the SVC ensures that specified limitations regarding voltage fluctuations and harmonic distortion at the point of common coupling are fulfilled for the plant.


Let’s see how arc furnace works…

Basic layout of electric arc furnace
Basic layout of electric arc furnace

1. Scrap metal is delivered to a scrap bay, located next to the melt shop.

(Scrap generally comes in two main grades: shred (whitegoods, cars and other objects made of similar light-gauge steel) and hemgy melt (large slabs and beams), along with some direct reduced iron (DRI) or pig iron for chemical balance.)

2.Ā The scrap is loaded into large buckets called baskets, with ‘clamshell’ doors for a base.

(Care is taken to layer the scrap in the basket to ensure good ļ¬zmace operation; heavy melt is placed on top of a light layer of protective shred, on top of which is placed more shred. These layers should be present in the furnace after charging)

3. The scrap basket is then taken to the melt shop, the roof is swung off the furnace, and the furnace is charged with scrap from the basket.

(Charging is one of the more dangerous operations for the EAF operators. There is a lot of energy generated by multiple tonnes of falling metal; any liquid metal in the ļ¬zrnace is oļ¬en displaced upwards and outwards by the solid scrap, and the grease and dust on the scrap is ignited if the ļ¬lmace is hot, resulting in a ļ¬reball erupting)

4. After charging, the roof is swung back over the furnace and meltdown commences.

(The electrodes are lowered onto the scrap, an arc is struck and the electrodes areĀ then set to bore into the layer of shred at the top of the ļ¬lrnace. Lower voltages areĀ selected for this ļ¬rst part of the operation to protect the roof and walls from excessiveĀ heat and damage from the arcs.

Once the electrodes have reached the heavy melt atĀ the base of the ļ¬tmace and the arcs are shielded by the scrap, the voltage can beĀ increased and the electrodes raised slightly, lengthening the arcs and increasingĀ power to the melt. This enables a molten pool to form more rapidly, reducing tap-t0-tap times.

Oxygen is also supersonically blown into the scrap, combusting or cuttingĀ the steel)

5. Once flat bath conditions are reached, i.e. the scrap has been completely melted down, another bucket of scrap can be charged into the furnace and melted down.

(After the second charge is completely melted, reļ¬ning operations take place to checkĀ and correct the steel chemistry and superheat the melt above its freezing temperatureĀ in preparation for tapping).

6. More slag formers are introduced and more oxygen is blown into the bath, burning out impurities such as silicon, sulfur, phosphorus, aluminium, manganese and calcium and removing their oxides to the slag.

(Removal of carbon takes place aļ¬er these elements have burnt out ļ¬rst, as they haveĀ a greater aļ¬‚initjv for oxygen. Metals that have a poorer aļ¬‚inity for oxygen than iron,Ā such as nickel and copper, cannot be removed through oxidation and must beĀ controlled through scrap chemistry alone, such as introducing the direct reduced ironĀ and pig iron mentioned earlier)

7. Once the temperature and chemistry are correct, the steel is tapped out into a preheated ladle through ļ¬lling the furnace.

8. During and after tapping, the furnace is ā€˜turned aroundā€˜.
(the slag door is cleaned of solidiļ¬ed slag, repairs may take place, and electrodes areĀ inspected for damage or lengthened through the addition of new segments; the tapholeĀ is ļ¬lled with sand at the completion of tapping).


EAF – Electric Arc Furnace (VIDEO)


References:
  • Substation design / application guide – V AYADURAI BSC, C.Eng, FIEE
  • ABB – Static Var Compensation of DC Arc Furnaces
  • Power Quality and Electrical Arc Furnaces – Horia Andrei, Costin Cepisca and Sorin Grigorescu
  • Harmonics and Flicker Analysis in Arc Furnace Power Systems – J. Sousa, M.T. Correia de Barros, M. Covas, A. Simoes

Premium Membership

Get access to premium HV/MV/LV technical articles, electrical engineering guides, research studies and much more! It helps you to shape up your technical skills in your everyday life as an electrical engineer.
More Information
Edvard Csanyi - Author at EEP-Electrical Engineering Portal

Edvard Csanyi

Hi, I'm an electrical engineer, programmer and founder of EEP - Electrical Engineering Portal. I worked twelve years at Schneider Electric in the position of technical support for low- and medium-voltage projects and the design of busbar trunking systems.

I'm highly specialized in the design of LV/MV switchgear and low-voltage, high-power busbar trunking (<6300A) in substations, commercial buildings and industry facilities. I'm also a professional in AutoCAD programming.

Profile: Edvard Csanyi

One Comment


  1. Waseem Khan
    Apr 06, 2022

    Dear Sir or Madam.
    I am a professor at Fujairah Menā€™s College. I and a group of professors are writing a book (Recycling and Reusing of Engineering Materials), which will be published by Elsevier in 2022. With your generous permission, we would like to use the following Figure in one of our Book Chapters.
    Could you please allow us to use this figure? We already cited your work in our chapter.
    Sincerely,

    Waseem Khan
    Fujairah Menā€™s College

    [email protected]

Leave a Comment

Tell us what you're thinking. We care about your opinion! Please keep in mind that comments are moderated and rel="nofollow" is in use. So, please do not use a spammy keyword or a domain as your name, or it will be deleted. Let's have a professional and meaningful conversation instead. Thanks for dropping by!

seven  ×    =  21

Learn How to Design Power Systems

Learn to design LV/MV/HV power systems through professional video courses. Lifetime access. Enjoy learning!

EEP Hand-Crafted Video Courses

Check more than a hundred hand-crafted video courses and learn from experienced engineers. Lifetime access included.
Experience matters. Premium membership gives you an opportunity to study specialized technical articles, online video courses, electrical engineering guides, and papers written by experienced electrical engineers.